|
|
 |
 |
Horizontal stand for ESP stages testing (ΓΡΘΡ/HSST)
Horizontal stand for ESP stages testing (ΓΡΘΡ/HSST)
The test is intended for taking ESP stages parameters: Q - H, Q-BEP, Q - N (stages
of 5 and 5A dimension types produced in Russia and of 338, 387, 400 series produced by
REDA, ESP, Centrilift and ODI companies).
The main technical specifications and characteristics:
- Diffuser maximal diameter - 90 mm
- The number of stages to be tested - 5
- Maximal flow rate - 250 m3/day
- Minimal measurable flow rate - 4,8 m3/day
- Maximal discharge pressure - 10 atm (1,0 Mpa)
- Pressure sensors error - 0,25 %
- Flowmeter gauge error - 1,0 %
- Measurable values measurements precision/reproducibility at nominal flowrate not worse
than:
- by pressure -1%
- by power - 2,5%
- by efficiency - 3,0%
- Number of rotations taken for converting- at Customer's request.
- Reservoir capacity, 2 pcs. - 200 l per reservoir.
- Operating fluid- drinking water
- Electric drive power- 3 kVt
- Number of drive rotations at nominal load - 2860 RPM
- Three-phase voltage- 380 V
- Frequency - 50 Hz.
- Operating fluid temperature range- from 15 to 40 °C.
- Shaft rotation direction - clockwise/counterclockwise
- Dimensions:
- length - 2100 mm
- width - 630 mm
- height - 2100 mm
- Test weight without water - 500 kg
The test-bench is easy in operation: automatic data logging system allows to
display all the parameters of tested stages in charts and tables, to process and to keep
test operation information about.
Test automation facilities allow:
- to exclude completely arbitrary interpretation of testing results,
- to measure flowrate, shaft power and rotation frequency, inlet and discharge pressure,
stage efficiency.
- to test stages of different producers with any rotation direction.
- to operate testing equipment without special training thanks to easy software interface.
Postwarranty period service is carried out at the Customer's will. It includes
routine maintenance, maintenance on the Customer's demand, providing the Customer with
spare parts after one-year warranty has expired. Set-up and adjustment works are carried
out during six months.
|
 |